Rail transport in Bhutan

There is no rail transport in Bhutan, but several rail lines have been planned.

Source: Wikipedia

Article

Rail transport in Bhutan

There is no rail transport in Bhutan, but several rail lines have been planned.

Planned

Rail transport in Bhutan

Bhutan and India signed a memorandum of understanding in January 2005 to connect Bhutan with the Indian Railways network with 5 new routes in Bhutan. Additionally, the Indian Military has also identified more routes to complement the India-China Border Roads (ICBR) and negate the Siliguri Corridor's geostrategic vulnerability, all of which will be 1,676 mm (5 ft 6 in) broad gauge.

<table><thead><tr><th>Route</th><th>Length (km)</th><th>Future Extensions</th><th>Operational (date)</th><th>Major tunnels # & names</th><th>Major bridges # & names</th><th>Conceived by</th><th>Status/Comments</th></tr></thead><tbody><tr><td>Gangtok-Nathang-Haa-Paro-Thimphu line</td><td></td><td>Ext-1: Yongphulla Airport-Bathpalathang Airport-Lingmethang(Mongar)-Thimphu-Paro International Airport line. Also see Ext-3 for Paro-Doklam-Lingzhi Yügyal Dzong connection.</td><td>N (2027?)</td><td></td><td></td><td>Indian Military</td><td>Gangtok-Nathang-Haa-Paro International Airport-Thimphu.</td></tr><tr><td>Banarhat–Samtse line</td><td>18 km</td><td>Ext-2: Samtse-Nathu La line</td><td>N (2025?)</td><td></td><td></td><td>2005 Indo-Bhutan MoU</td><td>Banarhat–Samtse.</td></tr><tr><td>Hasimara–Pasakha-Phuentsholing line</td><td>18 km</td><td>Ext-3: Phuentsholing-Paro International Airport-Doklam-Lingzhi Yügyal Dzong line.</td><td>N (2025?)</td><td></td><td></td><td>2005 Indo-Bhutan MoU</td><td>Hasimara Airforce Station–Pasakha-Phuentsholing. This line has the first priority to be constructed due to high passenger and goods transportation.</td></tr><tr><td>Kokrajhar–Gelephu line (Gelephu Airport)</td><td>70 km</td><td></td><td>N (2025?)</td><td></td><td></td><td>2005 Indo-Bhutan MoU</td><td>Kokrajhar of New Jalpaiguri–New Bongaigaon section–Gelephu. survey completed in April 2023 and construction will be completed by 2026 (aug 2023 update).</td></tr><tr><td>Pathsala–Naglam line</td><td>40 km</td><td>Ext-4: Naglam-Lingmethang(Mongar)-Lhuntse-Rinchen Bumpa line with spur to Trashiyangtse in northeast. Also see Ext-1 for connection in east to Yongphulla Airport (& Lumla-Tawang).</td><td>N (2025?)</td><td></td><td></td><td>2005 Indo-Bhutan MoU</td><td>Pathsala–Naglam.</td></tr><tr><td>Rangla–Darranga–Samdrup Jongkhar line</td><td>60 km</td><td></td><td>N (2025?)</td><td></td><td></td><td>2005 Indo-Bhutan MoU</td><td>Rangla–Darranga–Samdrup Jongkhar.</td></tr><tr><td>Tawang-Trashigang-Yongphulla line</td><td></td><td>See Ext-1 (Thimphu-Tawang).</td><td>N (2027?)</td><td></td><td></td><td>Indian Military</td><td>Tawang-Lumla-Trashigang-Yongphulla Airport.</td></tr></tbody></table>