Force majeure

In the intricate world of agreements and obligations, what happens when an extraordinary event—something truly beyond anyone's control—makes fulfilling a contract impossible? That's where force majeure comes in. This powerful legal concept acts as an escape hatch, determining who is responsible, or rather, not responsible, when unforeseen circumstances disrupt the best-laid plans. Join us as we explore how this fascinating principle navigates the unpredictable forces of the world, from natural disasters to global pandemics, impacting everything from international treaties to everyday business deals. Force majeure clauses provide legal escape hatches from contractual obligations when truly extraordinary and uncontrollable events occur. The specific interpretation and application of force majeure depend heavily on the contract's language, the governing legal system, and whether performance is genuinely impossible, not just inconvenient. While often associated with 'acts of God,' force majeure can also cover man-made disruptions like wars or strikes, but it rarely excuses negligence or ordinary business risks.

Source: Wikipedia

AI Summary

In the intricate world of agreements and obligations, what happens when an extraordinary event—something truly beyond anyone's control—makes fulfilling a contract impossible? That's where force majeure comes in. This powerful legal concept acts as an escape hatch, determining who is responsible, or rather, not responsible, when unforeseen circumstances disrupt the best-laid plans. Join us as we explore how this fascinating principle navigates the unpredictable forces of the world, from natural disasters to global pandemics, impacting everything from international treaties to everyday business deals.

The Unforeseen Hand of Fate

In the intricate world of contract law, there's a powerful phrase borrowed from French: force majeure. Pronounced 'forse ma-ZHOOR,' it refers to an extraordinary event or circumstance that is completely beyond anyone's control. When such an event strikes, a carefully crafted contract might suddenly become impossible—or at least incredibly difficult—to fulfill.

This special clause is designed to free one or both parties from their contractual obligations, or at least suspend them, for the duration of the unforeseen disruption. While often associated with 'acts of God' like natural disasters, force majeure can cover a broader range of events, from wars and strikes to epidemics or sudden legal changes. But let's be clear: it's not about escaping responsibility lightly, but acknowledging when circumstances truly overwhelm. It generally doesn't cover typical business risks, financial hardship, or problems that could have been reasonably foreseen or prevented by one of the parties.

Beyond Contracts: International Implications

The concept of force majeure isn't limited to private contracts; it also plays a significant role in international law. Here, it describes an irresistible force or unforeseen event that makes it materially impossible for a state to fulfill its international obligations. It's closely tied to the idea of a 'state of emergency,' allowing nations to temporarily deviate from treaties under truly exceptional circumstances.

The Devil in the Details: Contract Language

One crucial aspect of force majeure is that its application is highly specific. It's not a universal principle with a single definition; instead, it's primarily governed by the specific wording within a contract and the law of the country where that contract is valid. This means every clause is unique, detailing precisely what events count and what the consequences are.

Sophisticated contracts often include provisions that limit the 'shield' of force majeure. Parties might still be required to take reasonable steps to mitigate the event's effects or prevent further disruption. Moreover, a force majeure might only excuse part of an obligation—like delaying goods delivery, but not payment for what has already been received. In some legal systems, it can even overlap with established common law defenses like 'impossibility' or 'impracticability,' where performance becomes literally impossible or commercially unreasonable.

A Military Exception

Interestingly, the military uses a slightly different interpretation of force majeure. It describes an event, external or internal, that compels a vessel or aircraft to enter restricted airspace or territory without penalty. For instance, the 2001 Hainan Island incident saw a damaged U.S. Navy plane land at a Chinese military base. More recently, China cited force majeure when a surveillance balloon drifted into U.S. airspace, claiming it was an accident caused by uncontrollable factors like wind currents.

The Art of Negotiation

Given its power to excuse performance, the force majeure clause is often a point of intense negotiation in contracts, especially long-term ones. Parties will fiercely debate what events should—and shouldn't—be included. Consider a coal supply agreement: a mining company might try to list 'geological risk' as force majeure. However, a well-advised counterparty would argue that assessing geological reserves is fundamental to the mining business; such risks should ideally be factored into the company's operational planning and contractual commitments, not used as an escape clause. It’s a critical balancing act: ensuring protection against true catastrophes without allowing a party to simply evade responsibility for foreseeable business risks.

The sheer diversity of legal systems worldwide means that contracts, especially international ones, often define force majeure with painstaking detail. Some legal traditions strictly limit it to 'Acts of God'—natural phenomena like floods or earthquakes—while others broaden it to include human-made disruptions like war, terrorism, or even widespread power outages. This variability underscores why careful drafting is paramount.

In regions frequently hit by natural disasters, the definition needs even more precision. For instance, in an earthquake-prone area, a contract might specify that force majeure only applies if an earthquake exceeds a certain magnitude or causes a defined level of ground motion, rather than just 'an earthquake.' After all, a small tremor is very different from a catastrophic one; the mere occurrence of an event doesn't automatically imply disruption.

Legal Traditions: Common vs. Civil Law

The Common Law Approach

In common law systems, if a force majeure clause isn't explicitly in the contract—or if the event doesn't quite fit its definition—parties might turn to the doctrine of 'frustration.' This legal principle allows a contract to be discharged when an unforeseen event makes performance impossible or radically different from what was originally agreed, essentially rendering the contract's purpose moot.

English courts often interpret force majeure more broadly than just 'acts of God,' including events like strikes or machinery breakdowns. However, there's a critical caveat: if the breakdown was due to negligent lack of maintenance—something within a party's control—then a claim of force majeure might be dismissed. But even English law has its limits; ordinary disruptions like bad weather, local football matches, or even a funeral are generally not considered force majeure, as these are 'usual incidents interrupting work' that should be accounted for in normal business planning.

Indian courts, too, uphold the core principle of force majeure as a shield for parties facing events truly beyond their control. A 1961 Supreme Court ruling highlighted that the clause is intended to 'save the defaulting party from the consequences of anything over which he had no control.' Crucially, under Indian law, simply becoming more difficult, more expensive, or less profitable to perform a contract does not trigger force majeure. The event must make performance genuinely impossible or fundamentally alter its nature, not just squeeze profit margins.

In the United States, recent events like the COVID-19 pandemic have certainly tested the limits of force majeure clauses, with many parties attempting to invoke them for unforeseen disruptions. Even the recent surge in inflation has led some to consider whether drastically increased costs, if truly unforeseeable and uncontrollable, could trigger such provisions in real estate and other contracts, pushing the boundaries of what constitutes an excusable event.

The Civil Law Approach

Moving to civil law systems, such as in France, force majeure has a more formalized definition. To successfully invoke it, an event must typically satisfy three rigorous tests, ensuring it's not used as an easy escape from contractual duties.

Test	Description
Irresistibility	The event must be impossible to resist or overcome.
Unforeseeability	The event must be genuinely unpredictable at the time of contracting.
Externality	The event must originate from outside the control of the party invoking it.

Under French law, natural disasters like hurricanes and earthquakes are classic candidates for force majeure. It's a fundamental defense against liability across various legal domains. Interestingly, French law distinguishes force majeure from cas fortuit (an act of God that doesn't necessarily make performance impossible), with force majeure requiring the additional element of making performance truly insuperable.

Argentine Interpretation

Argentina, through its Civil Code, also provides a structured definition of force majeure, combining 'fuerza mayor' (superior force) and 'caso fortuito' (fortuitous event). These articles lay out specific characteristics that an event must possess to qualify, ensuring legal clarity. The 'Act of God' aspect can apply to both contractual and non-contractual obligations, offering broad protection when truly unforeseeable natural events disrupt duties.

Characteristic	Explanation
Unforeseeable/Inevitable	The event could not be foreseen, or if foreseen, was impossible to avoid.
External	The event must be outside the debtor's sphere of control.
Impossible	The event must make performance of the obligation absolutely impossible.

Hybrid Legal Systems: The Philippines

The Philippines offers a fascinating example of a hybrid legal system, blending both civil and common law traditions. Its interpretation of force majeure reflects this unique heritage, rooted in Article 1174 of its Civil Code, which states: 'Except in cases specified by the law, or when it is otherwise declared by stipulation, or when the nature of the obligation requires the assumption of risk, no person shall be responsible for those events which, could not be foreseen, or which, though foreseen were inevitable.' It's a concise summary of the concept's core, emphasizing a balance between responsibility and unavoidable circumstances.

In the Philippines, fortuitous events—the basis for force majeure—are generally understood to be natural, not man-made. Economic crises, for instance, typically don't qualify. However, a crucial exception exists: crises resulting from major conflicts, like World War II, have been recognized as force majeure events due to their overwhelming scale and unpredictability, acknowledging their profound impact on human affairs.

The landmark case of Nakpil & Sons v. CA clarified Article 1174, establishing four essential requisites for force majeure still applied today: the event must be independent of human will, impossible to foresee or avoid, render performance impossible, and the debtor must be free from any contribution to the injury. Ultimately, the Supreme Court in the Nakpil case ruled against force majeure, finding that despite an earthquake, construction deficiencies—like poor foundations—meant the damage wasn't solely due to an unavoidable natural event. This powerfully underscores that force majeure doesn't excuse negligence, and a party must be truly blameless for its invocation.

Harmonizing International Contracts

For international commercial contracts, the UNIDROIT Principles offer a harmonized approach to force majeure. Article 7.1.7 grants relief if a party proves non-performance was due to an impediment 'beyond its control,' which 'could not reasonably be expected to have been taken into account at the time of the conclusion of the contract or to have avoided or overcome it or its consequences.' It's an effort to bridge the gaps between diverse legal systems, providing a common ground for unforeseen disruptions in global commerce.

Article

Force majeure

In contract law, force majeure ( FORSS mə-ZHUR; French: [fɔʁs maʒœʁ]) is a common clause in contracts which essentially frees both parties from liability or obligation when an extraordinary event or circumstance beyond the control of the parties, such as a war, strike, riot, crime, epidemic, or sudden legal change prevents one or both parties from fulfilling their obligations under the contract. Force majeure often includes events described as acts of God, though such events remain legally distinct from the clause itself. In practice, most force majeure clauses do not entirely excuse a party's non-performance but suspend it for the duration of the force majeure.

Force majeure is generally intended to include occurrences beyond the reasonable control of a party, and therefore would not cover:

• Any result of the negligence or malfeasance of a party, which has a materially adverse effect on the ability of such party to perform its obligations. • Any result of the usual and natural consequences of external forces. To illuminate this distinction, take the example of an outdoor public event abruptly called off: • If the cause for cancellation is ordinary predictable rain, this is most probably not force majeure. • If the cause is a flash flood that damages the venue or makes the event hazardous to attend, then this almost certainly is force majeure, other than where the venue was on a known flood plain or the area of the venue was known to be subject to torrential rain. • Some causes might be arguable borderline cases (for instance, if unusually heavy rain occurred, rendering the event significantly more difficult, but not impossible, to safely hold or attend); these must be assessed in light of the circumstances. • Any circumstances that are specifically contemplated (included) in the contract—for example, if the contract for the outdoor event specifically permits or requires cancellation in the event of rain.

Under international law, it refers to an irresistible force or unforeseen event beyond the control of a state, making it materially impossible to fulfill an international obligation. Accordingly, it is related to the concept of a state of emergency.

Force majeure in any given situation is controlled by the law governing the contract, rather than general concepts of force majeure. Contracts often specify what constitutes force majeure via a clause in the agreement. So, the liability is decided per contract and neither by statute nor by principles of general law. The first step to assess whether—and how—force majeure applies to any particular contract is to ascertain the law of the country (state) which governs the contract.

Purpose

Force majeure

Time-critical and other sensitive contracts may be drafted to limit the shield of this clause where a party does not take reasonable steps (or specific precautions) to prevent or limit the effects of the outside interference, either when they become likely or when they actually occur. A force majeure may work to excuse all or part of the obligations of one or both parties. For example, a strike might prevent timely delivery of goods, but not timely payment for the portion delivered.

A force majeure may also be the overpowering force itself, which prevents the fulfillment of a contract. In that instance, it is actually the impossibility or impracticability defenses.

In the military, "force majeure" has a slightly different meaning. It refers to an event, either external or internal, that happens to a vessel or aircraft that allows it to enter normally restricted areas without penalty. An example would be the Hainan Island incident, where a U.S. Navy aircraft landed at a Chinese military airbase after a collision with a Chinese fighter in April 2001. Under the principle of force majeure, the aircraft was allowed to land without interference. Similarly, the 2023 Chinese balloon incident, in which a Chinese surveillance balloon was discovered in U.S. air space, the Chinese government stated that this "was entirely an accident caused by force majeure".

The importance of the force majeure clause in a contract, particularly one of any length in time, cannot be overstated as it relieves a party from an obligation under the contract (or suspends that obligation). What is permitted to be a force majeure event or circumstance can be the source of much controversy in the negotiation of a contract and a party should generally resist any attempt by the other party to include something that should, fundamentally, be at the risk of that other party. For example, in a coal-supply agreement, the mining company may seek to have "geological risk" included as a force majeure event; however, the mining company should be doing extensive exploration and analysis of its geological reserves and should not even be negotiating a coal-supply agreement if it cannot take the risk that there may be a geological limit to its coal supply from time to time. The outcome of that negotiation, of course, depends on the relative bargaining power of the parties and there will be cases where force majeure clauses can be used by a party effectively to escape liability for bad performance.

Because of the different interpretations of force majeure across legal systems, it is common for contracts to include specific definitions of force majeure, particularly at the international level. Some systems limit force majeure to an Act of God (such as floods, earthquakes, hurricanes, etc.) but exclude human or technical failures (such as acts of war, terrorist activities, labor disputes, or interruption or failure of electricity or communications systems). The advisory point is in drafting of contract make distinction between act of God and other shape of force majeure.

As a consequence, force majeure in areas prone to natural disaster requires a definition of the magnitude of the event for which force majeure could be considered as such in a contract. As an example, in a highly seismic area a contract could establish a technical definition of the amplitude of motion at the site, based for example on probability of occurrence studies. This parameter or parameters would later be monitored at the construction site (with a commonly agreed procedure). An earthquake could be a small shaking or damaging event. The occurrence of an earthquake does not imply the occurrence of damage or disruption. For small and moderate events it is reasonable to establish requirements for the contract processes; for large events it is not always feasible or economical to do so. Concepts such as 'damaging earthquake' in force majeure clauses do not help to clarify disruption, especially in areas where there are no other reference structures or most structures are not seismically safe.

Common law

Hong Kong

When force majeure has not been provided for in the contract (or the relevant event does not fall within the scope of the force majeure clause), and a supervening event prevents performance, it will be a breach of contract. The law of frustration will be the sole remaining course available to the party in default to end the contract. If the failure to perform the contract deprives the innocent party of substantially the whole benefit of the contract it will be a repudiatory breach, entitling the innocent party to terminate the contract and claim damages for that repudiatory breach.

England

As interpreted by English courts, the phrase force majeure has a more extensive meaning than "act of God" or vis major. Judges have agreed that strikes and breakdowns of machinery, which though normally not included in vis major, are included in force majeure. However, in the case of machinery breakdown, negligent lack of maintenance may negate claims of force majeure, as maintenance or its lack is within the owner's sphere of control.

The term cannot, however, be extended to cover delays caused by bad weather, football matches, or a funeral: the English case of Matsoukis v. Priestman & Co (1915) held that "these are the usual incidents interrupting work, and the defendants, in making their contract, no doubt took them into account.... The words 'force majeure' are not words which we generally find in an English contract. They are taken from the Code Napoleon, and they were inserted by this Romanian gentleman or by his advisers, who were no doubt familiar with their use on the Continent." In Hackney Borough Council v. Dore (1922) it was held that "The expression means some physical or material restraint and does not include a reasonable fear or apprehension of such a restraint."

India

In re Dharnrajmal Gobindram v. Shamji Kalidas [All India Reporter 1961 Supreme Court (of India) 1285], it was held that "An analysis of ruling on the subject shows that reference to the expression is made where the intention is to save the defaulting party from the consequences of anything over which he had no control."

Even if a force majeure clause covers the relevant supervening event, the party unable to perform will not have the benefit of the clause where performance merely become (1) more difficult, (2) more expensive, and/or (3) less profitable.

United States

For example, parties in the United States have used the COVID-19 pandemic as a force majeure in an attempt to escape contractual liability by applying the elements of an (1) unforeseeable event, (2) outside of the parties' control, that (3) renders performance impossible or impractical. Though force majeure events are generally thought to include natural events like tornadoes and often unforeseeable man-made events like labor strikes, the 2021–2023 Inflation Surge is also impacting force majeure provisions in leasing and other real estate contracts to include delays or excuses from performing contractual obligations due to the increased costs from rising inflation and rising interest rates.

Civil law

France

For a defendant to invoke force majeure in French law, the event proposed as force majeure must pass three tests:

• Externality: The defendant must have nothing to do with the event's happening. • Unpredictability: If the event could be foreseen, the defendant is obligated to have prepared for it. Being unprepared for a foreseeable event leaves the defendant culpable. This standard is very strictly applied: • CE 9 April 1962, "Chais d'Armagnac": The Council of State adjudged that, since a flood had occurred 69 years before the one that caused the damage at issue, the latter flood was predictable. • Administrative Court of Grenoble, 19 June 1974, "Dame Bosvy": An avalanche was judged to be predictable since another had occurred around 50 years before. • Irresistibility: The consequences of the event must have been unpreventable.

Other events that are candidates for force majeure in French law are hurricanes and earthquakes. Force majeure is a defense against liability and is applicable throughout French law. Force majeure and cas fortuit are distinct notions in French law.

Argentina

In Argentina, force majeure (fuerza mayor and caso fortuito) is defined by the Civil Code of Argentina in Article 512, and regulated in Article 513. According to these articles, force majeure is defined by the following characteristics:

• an event that could not have been foreseen or if it could, an event that could not be resisted. From these, it can be said that some acts of nature can be predicted, but if their consequences cannot be resisted it can be considered force majeure. • externality: the victim was not related directly or indirectly to the causes of the event, e.g., if the act was a fire, or a strike. • unpredictability: the event must had been originated after the cause of the obligation. • irresistibility: the victim cannot by any means overcome the effects.

In Argentina, Act of God can be used in Civil Responsibility regarding contractual or noncontractual obligations.

Hybrid law systems

Philippines

Lawyer Jose W. Diokno, who argued for the standards of fortuitous events

As the oldest state with a size of over 300,000 sq km to integrate the two legal systems, the Philippines also has its own unique interpretation of force majeure events. Under the Civil Code in Article 1174,

Except in cases specified by the law, or when it is otherwise declared by stipulation, or when the nature of the obligation requires the assumption of risk, no person shall be responsible for those events which, could not be foreseen, or which, though foreseen were inevitable.

Fortuitous events must not be caused by man but by nature. Therefore, economic crises are not considered as force majeure events that allows a debtor to be free of his obligation or debt. However such crises as an effect of wars such as World War II are considered as force majeure events as stated in Sagrada v. Nacoco (G.R. No. L-3756). The landmark case on this article and event is the case of Nakpil & Sons v. CA (G.R. No. L-47851). In this case, the Philippine Bar Association (PBA) building was the only building destroyed on Arzobispo St., Intramuros, Manila during an earthquake in 1968. The PBA, through the Jose W. Diokno Law Office, led by Sen. Diokno himself, sued Nakpil & Sons as well as the contractor of the building, United Construction Company, Inc., and won in the trial court. The case was merely reiterated and affirmed by the Court of Appeals. Finally in 1986 the case was decided with finality by the Supreme Court. The Court mentioned the four requisites, by breaking down Article 1174. These are still the requisites used in Philippine courts today. These requisites are:

In doing so, the Supreme Court ruled that there is no fortuitous event, after also observing certain problems in construction such as measurement deficiencies and poor foundations.

UNIDROIT Principles

Force majeure

Article 7.1.7 of the UNIDROIT Principles of International Commercial Contracts provides for a form of force majeure similar, but not identical, to the common law and civil law concepts of the term: relief from performance is granted "if that party proves that the non-performance was due to an impediment beyond its control and that it could not reasonably be expected to have taken the impediment into account at the time of the conclusion of the contract or to have avoided or overcome it or its consequences."