Liquefied natural gas

Production

The largest LNG train in operation is in Qatar, with a total production capacity of 7.8 million tonnes per annum (MTPA). LNG is loaded onto ships and delivered to a regasification terminal, where the LNG is allowed to expand and reconvert into gas. Regasification terminals are usually connected to a storage and pipeline distribution network to distribute natural gas to local distribution companies (LDCs) or independent power plants (IPPs).


World total production

The LNG industry developed slowly during the second half of the last century because most LNG plants are located in remote areas not served by pipelines, and because of the high costs of treating and transporting LNG. Constructing an LNG plant costs at least $1.5 billion per 1 MTPA capacity, a receiving terminal costs $1 billion per 1 bcf/day throughput capacity and LNG vessels cost $200 million–$300 million.


World total production

Since 2004, the large number of orders increased demand for shipyard slots, raising their price and increasing ship costs. The per-ton construction cost of an LNG liquefaction plant fell steadily from the 1970s through the 1990s. The cost reduced by approximately 35 percent. However, recently the cost of building liquefaction and regasification terminals doubled due to increased cost of materials and a shortage of skilled labor, professional engineers, designers, managers and other white-collar professionals.

WikTok | Your Personalised Encyclopedia

Train your feed. Demystify any topic with AI. Read with friends.

Follow what fascinates you, crack open any topic with AI, save favourites, share great finds, and level up as you go.

Swipe left and right to improve your feed!